It is suggested to evaluate the possibility of optimizing the flow between the Non-Conforming Outputs module and the Improvement module, so that the system allows greater integration or visualization of the closing state between both records. Currently, when a non-compliant output generates an action in the Improvement module, separate closures must be made, which can cause confusion for some users and duplication in monitoring activities. As a future improvement, it is proposed that the system allow: Clearly visualize the status of the associated improvement from the non-compliant output. Include alerts or informational messages that explain the reason for the double shutdown. Facilitate traceability between immediate correction and corrective action. This improvement would contribute to a better understanding of the system by users, greater efficiency in monitoring and strengthening the Quality Management System.