That the system allows the application of the frequency filter and results in compliance with the General Plan (in our case Institutional Development Plan) and Annual Strategic Plan. That is, if I am in a later period and I want Check what the compliance was by quarter of the previous year, the system can estimate it and that these compliances can be exported in a report. To date, the system only shows an overall average compliance, taking up the previous example, if I consult in a later period (2025) and I would like to check what result was obtained in the first half of 2024 and then in the second half of 2024, the system gives me the same result, even if I fill in the dates included in those periods.