Currently, in the Indicators module, when a deviation or result that requires intervention is identified, only the option of creating a new opportunity for improvement is enabled. However, there is no option to associate an existing improvement action that was previously created in the Continuous Improvement module. It is proposed to enable the functionality that allows you to directly link an existing action from the Indicators module, avoiding duplication of actions and ensuring greater traceability, coherence and control within the Management System. This improvement would optimize the management of corrective, preventive and improvement actions, allowing a more efficient integration between modules and strengthening the monitoring of strategic results.